
Is your Sport Surface fading?
..cracking?
..peeling? ..holding water?
First Impression, Inc. and M-C Sport Systems, Inc.
has the experience and expertise to provide quality new construction, resurfacing or
reconstruction method that will address your court's unique and individual problems. Call
us for a free inspection including recommendation and budgetary costs.
A. Crackfill Only
Fill cracks only and color to match existing
surface.
Improves the surface for true ball response.
Repairs are seasonal.
B. New Color System
Fill cracks, level low areas to minimize
puddling and install new color system.
Leveling and color system will last 5 - 7
years.
Crackfilling needs to be done seasonally.
C. Asphalt Overlay
Install 2 layers Geotextile fabric, 1 1/2 -
2" asphalt and new color system.
This will bring back court planarity.
Fabrics and asphalt resist the transmission of
structural cracks to new surface.
D. Slip Sheet or Recycled Asphalt
New laser graded sub-base.
Install 2 layers of new asphalt, new color
system and net posts.
These are "like new" courts.
E. Clay Type or Synthetic Courts
Resurface or conversion to Clay Tennis Courts.
"A whole new ball game."
Email |